Power station Grossenkneten

Cable entries and flexible cable sealing system

Natural gas processing plant
Cable entries and flexible cable sealing system

The construction of a combined power-heat generation facility was started in October 2012 with a planed performance of 30 MW electrical and 80 tons steam. Gas is driving a giant turbine which is moving the generator. The so occuring hot exhaust is used to generate the steam required for the production process via the heat exchange device. The power plant is supplying the electricity for the natural gas processing plant and the compressor station. The total volume of investment was at approx. 65 Mio Euro and the plant was launched in 2014.

For wall penetrations HSI 150-K2 wall entries with different sizes were installed. Connection at the wall and floor areas were done with the flexible cable entry system KES-M 150 and the Hateflex spiral hose. Cable entry systems are ideal for achieving optimized and pressure tight empty duct connections at buildings/manholes, to penetrate bottom slabes and to act as additional ducts for later use. The KES-M 150 and the renovation wall sleeve SFR allowed to built special floor penetrations to achieve the required floor level height and pressure tight penetrations.